Currently, the newly opened section runs from Masteps to the Irvine’s second gate.
From the look of things, there is no definite timeline for the completion of the entire project.
In a Facebook post shared yesterday (Monday), the Ministry noted that roadworks are still progressing towards the Manyame (Hunyani) River Bridge.
“Another section of the Chitungwiza Road Rehabilitation Project has been completed and opened to traffic, marking yet another milestone in the ongoing drive to improve Zimbabwe’s road network,” the post read.
“Motorists can now enjoy the rehabilitated stretch, while construction works continue towards the Manyame River Bridge. Kilometre by kilometre, we are rebuilding our road network.”
The main road has been closed since 1 November after the Ministry issued a public notice warning of traffic disruptions along Chitungwiza Road at the Manyame River Bridge.
“Motorists are advised to plan their journeys in advance, follow traffic management instructions and comply with directions from traffic officers on site. The public is urged to exercise caution and allow for additional travel time when using alternative routes,” the Ministry stated at the time.
Since the closure, commuter omnibuses and motorists have been using the accessible section of the highway to drop passengers at the foot of the bridge, leaving commuters to cross on foot to connect to transport on the other side.
Meanwhile, both public and private drivers are diverting onto Manyame Drive, snaking through the suburb before crossing the river at a low-level bridge (dwala) through to Eyecourt to reconnect with Trabablas Interchange/Road.
Residents of Manyame Park—particularly those living along Manyame Drive—have called on the Ministry to expedite the project so traffic can return to the main highway, saying they fear for their own safety and that of their children due to the sudden surge in heavy traffic.